Simulation test gas_horiz_10_10_10_CASE1.DATA, run 170729 06h22m List of variables available for simulation test gas_horiz_10_10_10_CASE1.DATA : BPR:1 BPR:1,1,1 BPR:10,10,10 BPR:1000 FGOR FOPR WBHP:INJ WBHP:PROD WGIR:INJ WGIR:PROD WGIT:INJ WGIT:PROD WGOR:PROD WGPR:INJ WGPR:PROD WGPT:INJ WGPT:PROD WOIR:INJ WOIR:PROD WOIT:INJ WOIT:PROD WOPR:INJ WOPR:PROD WOPT:INJ WOPT:PROD WWIR:INJ WWIR:PROD WWIT:INJ WWIT:PROD WWPR:INJ WWPR:PROD WWPT:INJ WWPT:PROD ********************************************************************** * * * This is flow_ebos (version 2017.04) * * (eWoms version: 2017.04.0 ("Fabienne")) * * * * Flow is a simulator for fully implicit three-phase black-oil flow, * * and is part of OPM. For more information see: * * http://opm-project.org * * * ********************************************************************** Reading the deck file 'gas_horiz_10_10_10_CASE1.DATA' ***************Saturation Functions Diagnostics*************** System: Black-oil system. Relative permeability input format: Saturation Family I. Number of saturation regions: 1 ================ Starting main simulation loop =============== Time step 0 at day 0/3650, date = 01-Jan-2015 Substep 0, stepsize 10.23 days. Problem: Failed to complete a time step within 15 iterations. Problem: Solver convergence failed, cutting timestep to 3.375900 days.  Substep 0, stepsize 3.3759 days. Substep summary: well its = 7, newton its = 6, linearizations = 7 ( 0.027 sec), linear its = 20 ( 0.009 sec) Substep 1, stepsize 6.7518 days. Substep summary: well its = 7, newton its = 4, linearizations = 5 ( 0.020 sec), linear its = 25 ( 0.010 sec) Substep 2, stepsize 20.8723 days. Oscillating behavior detected: Relaxation set to 0.900000 Substep summary: well its = 7, newton its = 10, linearizations = 11 ( 0.043 sec), linear its = 35 ( 0.015 sec) Warning: Keyword 'BASIC' is unhandled for output to file. Warning: Keyword 'PRES' is unhandled for output to file. Warning: Keyword 'RS' is unhandled for output to file. Warning: Keyword 'SGAS' is unhandled for output to file. Warning: Keyword 'WELLS' is unhandled for output to file. Time step 1 at day 31/3650, date = 01-Feb-2015 Substep 0, stepsize 28 days. Substep summary: well its = 5, newton its = 4, linearizations = 5 ( 0.019 sec), linear its = 45 ( 0.016 sec) Warning: Keyword 'BASIC' is unhandled for output to file. Warning: Keyword 'PRES' is unhandled for output to file. Warning: Keyword 'RS' is unhandled for output to file. Warning: Keyword 'SGAS' is unhandled for output to file. Warning: Keyword 'WELLS' is unhandled for output to file. Time step 2 at day 59/3650, date = 01-Mar-2015 Substep 0, stepsize 31 days. Substep summary: well its = 7, newton its = 3, linearizations = 4 ( 0.015 sec), linear its = 30 ( 0.011 sec) Warning: Message limit reached for message tag: Unhandled output keyword Time step 3 at day 90/3650, date = 01-Apr-2015 Substep 0, stepsize 30 days. Substep summary: well its = 4, newton its = 3, linearizations = 4 ( 0.015 sec), linear its = 24 ( 0.009 sec) Time step 4 at day 120/3650, date = 01-May-2015 Substep 0, stepsize 31 days. Substep summary: well its = 7, newton its = 3, linearizations = 4 ( 0.015 sec), linear its = 39 ( 0.013 sec) Time step 5 at day 151/3650, date = 01-Jun-2015 Substep 0, stepsize 30 days. Substep summary: well its = 5, newton its = 3, linearizations = 4 ( 0.015 sec), linear its = 34 ( 0.012 sec) Time step 6 at day 181/3650, date = 01-Jul-2015 Substep 0, stepsize 31 days. Substep summary: well its = 6, newton its = 3, linearizations = 4 ( 0.015 sec), linear its = 33 ( 0.011 sec) Time step 7 at day 212/3650, date = 01-Aug-2015 Substep 0, stepsize 31 days. Substep summary: well its = 5, newton its = 4, linearizations = 5 ( 0.019 sec), linear its = 45 ( 0.016 sec) Time step 8 at day 243/3650, date = 01-Sep-2015 Substep 0, stepsize 30 days. Substep summary: well its = 6, newton its = 5, linearizations = 6 ( 0.024 sec), linear its = 49 ( 0.018 sec) Time step 9 at day 273/3650, date = 01-Oct-2015 Substep 0, stepsize 31 days. Substep summary: well its = 1, newton its = 5, linearizations = 6 ( 0.022 sec), linear its = 71 ( 0.024 sec) Time step 10 at day 304/3650, date = 01-Nov-2015 Substep 0, stepsize 30 days. Substep summary: well its = 1, newton its = 5, linearizations = 6 ( 0.022 sec), linear its = 50 ( 0.018 sec) Time step 11 at day 334/3650, date = 01-Dec-2015 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Switching control mode for well INJ from BHP to SURFACE_RATE Switching control mode for well INJ from SURFACE_RATE to BHP Problem: Failed to complete a time step within 15 iterations. Problem: Solver convergence failed, cutting timestep to 10.230000 days.  Substep 0, stepsize 10.23 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 1, newton its = 6, linearizations = 7 ( 0.027 sec), linear its = 14 ( 0.007 sec) Substep 1, stepsize 20.77 days. Substep summary: well its = 1, newton its = 4, linearizations = 5 ( 0.018 sec), linear its = 27 ( 0.010 sec) Time step 12 at day 365/3650, date = 01-Jan-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 13 at day 396/3650, date = 01-Feb-2016 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 14 at day 424/3650, date = 29-Feb-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 15 at day 455/3650, date = 31-Mar-2016 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 16 at day 485/3650, date = 30-Apr-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 11 ( 0.004 sec) Time step 17 at day 516/3650, date = 31-May-2016 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 18 at day 546/3650, date = 30-Jun-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 19 ( 0.007 sec) Time step 19 at day 577/3650, date = 31-Jul-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 19 ( 0.007 sec) Time step 20 at day 608/3650, date = 31-Aug-2016 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 21 ( 0.007 sec) Time step 21 at day 638/3650, date = 30-Sep-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 18 ( 0.007 sec) Time step 22 at day 669/3650, date = 31-Oct-2016 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 23 at day 699/3650, date = 30-Nov-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 18 ( 0.007 sec) Time step 24 at day 730/3650, date = 31-Dec-2016 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 18 ( 0.007 sec) Time step 25 at day 761/3650, date = 31-Jan-2017 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 26 at day 789/3650, date = 28-Feb-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 19 ( 0.007 sec) Time step 27 at day 820/3650, date = 31-Mar-2017 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 28 at day 850/3650, date = 30-Apr-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 21 ( 0.008 sec) Time step 29 at day 881/3650, date = 31-May-2017 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 30 at day 911/3650, date = 30-Jun-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 31 at day 942/3650, date = 31-Jul-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 32 at day 973/3650, date = 31-Aug-2017 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 33 at day 1003/3650, date = 30-Sep-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 34 at day 1034/3650, date = 31-Oct-2017 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 35 at day 1064/3650, date = 30-Nov-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 36 at day 1095/3650, date = 31-Dec-2017 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 37 at day 1126/3650, date = 31-Jan-2018 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 38 at day 1154/3650, date = 28-Feb-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 39 at day 1185/3650, date = 31-Mar-2018 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 40 at day 1215/3650, date = 30-Apr-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 41 at day 1246/3650, date = 31-May-2018 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 27 ( 0.009 sec) Time step 42 at day 1276/3650, date = 30-Jun-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 43 at day 1307/3650, date = 31-Jul-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 44 at day 1338/3650, date = 31-Aug-2018 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 28 ( 0.010 sec) Time step 45 at day 1368/3650, date = 30-Sep-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 46 at day 1399/3650, date = 31-Oct-2018 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 29 ( 0.010 sec) Time step 47 at day 1429/3650, date = 30-Nov-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 48 at day 1460/3650, date = 31-Dec-2018 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 49 at day 1491/3650, date = 31-Jan-2019 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 50 at day 1519/3650, date = 28-Feb-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 51 at day 1550/3650, date = 31-Mar-2019 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 52 at day 1580/3650, date = 30-Apr-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 53 at day 1611/3650, date = 31-May-2019 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.009 sec) Time step 54 at day 1641/3650, date = 30-Jun-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 55 at day 1672/3650, date = 31-Jul-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 56 at day 1703/3650, date = 31-Aug-2019 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 57 at day 1733/3650, date = 30-Sep-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 58 at day 1764/3650, date = 31-Oct-2019 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 59 at day 1794/3650, date = 30-Nov-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 60 at day 1825/3650, date = 31-Dec-2019 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 61 at day 1856/3650, date = 31-Jan-2020 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 62 at day 1884/3650, date = 28-Feb-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 63 at day 1915/3650, date = 30-Mar-2020 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 64 at day 1945/3650, date = 29-Apr-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 65 at day 1976/3650, date = 30-May-2020 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 66 at day 2006/3650, date = 29-Jun-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 67 at day 2037/3650, date = 30-Jul-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 68 at day 2068/3650, date = 30-Aug-2020 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 69 at day 2098/3650, date = 29-Sep-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 70 at day 2129/3650, date = 30-Oct-2020 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 71 at day 2159/3650, date = 29-Nov-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 72 at day 2190/3650, date = 30-Dec-2020 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 73 at day 2221/3650, date = 30-Jan-2021 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 74 at day 2249/3650, date = 27-Feb-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 75 at day 2280/3650, date = 30-Mar-2021 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.009 sec) Time step 76 at day 2310/3650, date = 29-Apr-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 77 at day 2341/3650, date = 30-May-2021 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 78 at day 2371/3650, date = 29-Jun-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 79 at day 2402/3650, date = 30-Jul-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 27 ( 0.009 sec) Time step 80 at day 2433/3650, date = 30-Aug-2021 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 81 at day 2463/3650, date = 29-Sep-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 27 ( 0.009 sec) Time step 82 at day 2494/3650, date = 30-Oct-2021 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 83 at day 2524/3650, date = 29-Nov-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 27 ( 0.009 sec) Time step 84 at day 2555/3650, date = 30-Dec-2021 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 27 ( 0.009 sec) Time step 85 at day 2586/3650, date = 30-Jan-2022 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 21 ( 0.007 sec) Time step 86 at day 2614/3650, date = 27-Feb-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 87 at day 2645/3650, date = 30-Mar-2022 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 88 at day 2675/3650, date = 29-Apr-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 89 at day 2706/3650, date = 30-May-2022 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 90 at day 2736/3650, date = 29-Jun-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.009 sec) Time step 91 at day 2767/3650, date = 30-Jul-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.009 sec) Time step 92 at day 2798/3650, date = 30-Aug-2022 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.012 sec), linear its = 22 ( 0.008 sec) Time step 93 at day 2828/3650, date = 29-Sep-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.012 sec), linear its = 24 ( 0.009 sec) Time step 94 at day 2859/3650, date = 30-Oct-2022 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.012 sec), linear its = 23 ( 0.008 sec) Time step 95 at day 2889/3650, date = 29-Nov-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 96 at day 2920/3650, date = 30-Dec-2022 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 97 at day 2951/3650, date = 30-Jan-2023 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 20 ( 0.007 sec) Time step 98 at day 2979/3650, date = 27-Feb-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 99 at day 3010/3650, date = 30-Mar-2023 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 100 at day 3040/3650, date = 29-Apr-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 101 at day 3071/3650, date = 30-May-2023 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 102 at day 3101/3650, date = 29-Jun-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 103 at day 3132/3650, date = 30-Jul-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 104 at day 3163/3650, date = 30-Aug-2023 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.009 sec) Time step 105 at day 3193/3650, date = 29-Sep-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 24 ( 0.008 sec) Time step 106 at day 3224/3650, date = 30-Oct-2023 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 107 at day 3254/3650, date = 29-Nov-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 108 at day 3285/3650, date = 30-Dec-2023 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 109 at day 3316/3650, date = 30-Jan-2024 Substep 0, stepsize 28 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 22 ( 0.008 sec) Time step 110 at day 3344/3650, date = 27-Feb-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 111 at day 3375/3650, date = 29-Mar-2024 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 112 at day 3405/3650, date = 28-Apr-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 113 at day 3436/3650, date = 29-May-2024 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 114 at day 3466/3650, date = 28-Jun-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 115 at day 3497/3650, date = 29-Jul-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 116 at day 3528/3650, date = 29-Aug-2024 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 117 at day 3558/3650, date = 28-Sep-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) Time step 118 at day 3589/3650, date = 29-Oct-2024 Substep 0, stepsize 30 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 25 ( 0.009 sec) Time step 119 at day 3619/3650, date = 28-Nov-2024 Substep 0, stepsize 31 days. Switching control mode for well INJ from SURFACE_RATE to BHP Substep summary: well its = 2, newton its = 2, linearizations = 3 ( 0.011 sec), linear its = 23 ( 0.008 sec) ================ End of simulation =============== Total time (seconds): 3.28996 Solver time (seconds): 2.88302 Assembly time (seconds): 1.62465 (Failed: 0.123521; 7.60293%) Linear solve time (seconds): 1.11618 (Failed: 0.0375584; 3.3649%) Update time (seconds): 0.110811 (Failed: 0.00924493; 8.34295%) Output write time (seconds): 0.334942 Overall Well Iterations: 294 (Failed: 8; 2.72109%) Overall Linearizations: 439 (Failed: 32; 7.28929%) Overall Newton Iterations: 316 (Failed: 32; 10.1266%) Overall Linear Iterations: 3122 (Failed: 70; 2.24215%)